Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe
   

View Tenders
Daily 4,000 Tenders Uploaded


India Tenders - view all indian tender notifications, Indian government tenders news details, International Tenders inquiry, online tender Management System, online tenders and bidding, india Tender Online, tender Management System, Free Tenders from India, procurement notices, Tender procurement notices, Invitation of tender bids, top Indian tender portal, India Tenders Notification Services, Indian government tenders and Project Info, view all Latest Active Tenders.


S.No. Last Date of submission of tender
21 28-03-2018 14:00:00
  Construction Of Access Controlled Nagpur - Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) In The State Of Maharashtra On Epc Mode For Package 7, From Km. 296.000 To Km. 347.190 In Section - Village Banda To Village Sawargaon Mal In District Buldhana.
 
22 28-03-2018 02:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 7 Village Banda To Village Sawargaon Mal In District Buldhana
 
23 22-02-2018 12:00:00
  Renewal Of Insurance Policy For The Assets Of Assam Gas Based Power Plant, Bokuloni, Assam For A Period Of 1(One) Year W.E.F. 00.00.00 Hours Of 19.03.2018. .
 
24 20-03-2018
  Survey Design Construction Operation Maintenance Management Of Irrigation Network Cca 131750 Ha Area Under Rmc And Lmc Of Parwan Project Through Pressurized Distribution Pressurized Water Application Method On Epc Single Responsibility Turnkey Basis .
 
25 20-03-2018 18:00:00
  Survey Design Construction Operation Maintenance Management Of Irrigation Network To Irrigate The Cca Of 131750 Ha Area Of Parwan Project Through Pressurized Distribution And Pressurized Water Application On Epc Single Responsibility Turnkey Basis .
 
26 28-03-2018 14:00:00
  Construction Of Access Controlled Nagpur - Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) In The State Of Maharashtra On Epc Mode For Package 13, From Km. 577.739 To Km. 623.379 (Section - Village Sonari To Village Taranganpada) In District Nashik.
 
27 26-03-2018 11:00:00
  4 Laning Of Aligarh-Kanpur Section From Km 356.000(Design Chainage 373.085) To Km 414.000(Design Chainage 433.728)(Package-V From Mitrasen-Kanpur) Of Nh-91 In The State Of Uttar Pradesh On Hybrid Annuity Mode Under Bharatmala Pariyojana .
 
28 26-03-2018 11:00:00
  6 Lane Durg-Raipur Bypass Section Of Nh-53 From Design Chainage Km 44.500 To Km 92.230 (Pkg.B) Under Bharatmala Pariyojana (Lot-3/Chhattisgarh/ Package-1, Mumbai-Kolkata Economic Corridor) In Chhattisgarh On Ham .
 
29 28-03-2018 14:00:00
  Construction Of Access Controlled Nagpur - Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) In The State Of Maharashtra On Epc Mode For Package 12, From Km. 532.094 To Km. 577.739 (Section - Village Pathare Kh. To Village Sonari) In District Nashik.
 
30 12-03-2018 11:00:00
  Six Laning Of Nh-140 From Chittor (Design Km 0.000-Existing Km 158.000 Of Nh-4) To Mallavaram (Design Km 61.128-Existing Km 41.800 Of Nh-140) In The State Of Andhra Pradesh Under Bharatmala Pariyojna On Hybrid Annuity Mode .
 
31 21-02-2018
  Tender For Invites Proposal For Supervision And Quality Control Consultancy At Project Implementation Unit Level During The Execution Of Multi Village Rural Water Supply Scheme
 
32 21-02-2018
  Proposal For Supervision And Quality Control Consultancy At Project Implementation Unit Level During The Execution Of Multi Villages Water Supply Schemes
 
33 05-03-2018 11:00:00
  Construction Of Six Lane Vadodara Kim Expressway From Km 355.00 To Km 378.740 (Padra To Vadodara Section Of Vadodara Mumbai Expressway) In The State Of Gujarat Under Nhdp Phase - Vi On Ham (Phase Ia-Package I) .
 
34 21-02-2018 11:00:00
  Rfp For Four Laning Of Sattanathapuram To Nagapattinam (Design Ch Km 123.800 To Km 180.624) Section Of Nh-45A (New Nh -332) In The State Of Tamil Nadu Under Nhdp Phase-Iv On Hybrid Annuity Mode .
 
35 12-03-2018 15:30:00
  Installation , Commissioning And Maintenance Of Alternate Mpls Network .-Network /Communication Equipments .
 
36 28-03-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 5 Village Kinhiraja To Village Kenwad In District Washim .
 
37 19-03-2018 11:00:00
  Construction Of Dwarka Expressway From From Shiv Murti Intersection At Km 20 Of Nh 8 Till Rail Under Ge Rub Near Dwarka Sector 21 From Km 0.800 To 5.300 Pkg I In Delhi On Epc Mode. .
 
38 26-03-2018 11:00:00
  6 Lane Durg Raipur Bypass Section Of Nh-53(Existing Km 329.400 Near Tedesera Village To Near Khatti Village) (Pkg. A) Under Bharatmala Pariyojana (Lot-3/Chhattisgarh/ Package-1, Mumbai Kolkata Economic Corridor) In Chhattisgarh On Ham .
 
39 28-03-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 1 Village Shivmadka To Village Khadki Amgaon In District Nagpur .
 
40 28-02-2018 12:00:00
  Construction Of Hostels For Government Polytechnic Colleges At Various Locations In Karnataka Under Scp Tsp For Department Of Technical Education Bengaluru.
 
<< Previous   Next >>

Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe

� 2000 Sugal Infotech LLP.