Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe
   

View Tenders
Daily 4,000 Tenders Uploaded


India Tenders - view all indian tender notifications, Indian government tenders news details, International Tenders inquiry, online tender Management System, online tenders and bidding, india Tender Online, tender Management System, Free Tenders from India, procurement notices, Tender procurement notices, Invitation of tender bids, top Indian tender portal, India Tenders Notification Services, Indian government tenders and Project Info, view all Latest Active Tenders.


S.No. Last Date of submission of tender
21 26-07-2018 12:00:00
  Supply Of Ball Valves .
 
22 06-08-2018 18:00:00
  Lomg Terms Import Agreement Of 500000 Mt Of Mop .
 
23 07-08-2018 10:00:00
  Tender Improvement And Development Of No. 114Mmett18001595. Any Further Changes Will Be Intimated Through Above Mentioned Website Only . .
 
24 24-07-2018 17:00:00
  Construction Of New Barrage On River Krishna, 23 Kms Upstream Of Existing Prakasam Barrage, At Vykuntapuram (V), Amaravati (M), Guntur District .
 
25 31-07-2018 11:00:00
  Excavation Of Overburden Of First Dig (Solid) By Mechanical Means Such As Excavators, Dumpers/Tippers Etc As Per Instructions Of Engineer-In-Charge At Specified Places Of Jayant Ocp .
 
26 24-07-2018
  Improvement To Roads Joining At Akola, Washim, Buldhana Distt.Rithad-Washim-Shelubazar,Buldhana-Dhad-Nandura-Motala,Hiwarkhed-Telhara Adsul-Mundgaon-Wani Warula,Shegaon-Nagzari- Wadgaon-Medshi-Dava, Kapsi-Karanja Km 274.89 (Third Call)
 
27 19-07-2018 23:00:00
  Request For Proposal For Upgradation Of Roads In Maharashtra State For Two Laning Road / Two Laning Road With Paved Shoulder Under Mrip Package On Hybrid Annuity Mode Of (Ham) (Under Public Works Circle, Akola)(3Rd Call) .
 
28 30-07-2018 17:00:00
  For Providing Consultancy Services For Preparation Of Master Plan, Concept Study And Planning, Detailed Architectural Planning, Drawings, Structural Design And Detailed Engineering, Detailed Project Report, Engaging Contractors For Execution, Supervision, Project Management Consultancy Services For The Project ‘Establishment Of Pandit Deen Dayal Upadhyaya University Of Health Sciences, Karnal (Kutail)’ On Turnkey Basis As Specified In Request For Proposal (From Concept To Commissioning) .
 
29 24-07-2018 18:00:00
  Ham Ml-1 Total 9 Various Road Under Package Mu-R8, Mu-R9, Mu-R10, Mu-R12, Mu-R13, Mu-R14, Mu-R15 In Raigad And Ratnagiri District. Total Length 394.39 K.M. .
 
30 24-07-2018 14:30:00
  Supply of Loading System A Per Drg. No. 176-6000 .
 
31 25-07-2018 15:00:00
  Investigation, Design And Construction Of Sub Structure & Super Structure Civil Structure (Sub Structure & Super Structure) Works For High Court Building Of Basement + Ground + 7 Floors (B+G+7) Including Earthwork, Pile, Raft Foundations, Rcc Framed Structure Consisting Of Retaining Wall, Shear/Core Wall, Slabs, Beam, Pt Slab & Beam, Ridge Beams, Inclined Columns, Using Modular/System Formwork, Reinforcement Works, Waterproofing And Other Miscellaneous Works Complying To The Requirements Of Griha Five Star Rating Certification For High Court Building In Super Block "F" For Amaravati Government Complex Area In Amaravati Capital City, Andhra Pradesh On Design Build Item Rate Contract .
 
32 25-07-2018 15:00:00
  Investigation, Design And Construction Of Civil Structure Works For High Court Building Basement + Ground + Floor Including Earthwork, Pile, Raft Foundations, Rcc Framed Structure Consisting Of Retaining Wall, Shear/ Core Wall, Slabs, Beams, Pt Slabs And Beams, Ridge Beams, Inclined Columns, Using Modular/ System Formwork, Reinforcement Works, Waterproofing And Other Miscellaneous Works Complying To The Requirements Of Griha Five Star Rating Certification For Hifh Court Building.
 
33 23-07-2018 11:00:00
  Four Lane Divided Carriageway From Vadipatti (D.Ch 0.000) To Chittampatti (D.Ch 29.960) Stretch Of Madurai Ring Road Section Of Nh-744A On Epc Mode Under Bharatmala Pariyojana Phase-I In The State Of Tamil Nadu .
 
34 26-07-2018
  Up Gradat6ion Of Passenger Terminal Building And Airside Facilities Sh: Construction Of New Terminal Building, Elevated Road Along With Associated Electromechanical, Airport System, It Works Including Comprehensive Maintenance And Operation
 
35 26-07-2018 18:00:00
  Up Gradation Of Passenger Terminal Building And Airside Facilities At Tiruchiraplli International Airport. Sh. Construction Of New Tb, Elevated Road Alongwith Associated Elect. Mechanical, Airport System, It Works And Comprehensive Maintenance .
 
36 30-07-2018 15:30:00
  Providing Drinking Water Supply Projects In Krishna District .
 
37 23-08-2018 11:00:00
  4-Laning Of Delhi-Saharanpur Nh-709B From Km 92.200(Near Shamli) To Km 155.025 (Near Saharanpur), (Length 62.772 Km) In Uttar Pradesh (Pkg-Ii) On Epc Mode Under Bharatmala Pariyojana .
 
38 08-08-2018 18:00:00
  Setting Up Of 2500 Mw Ists- Connected Wind-Solar Hybrid Power Projects (Tranche-I) .
 
39 19-07-2018 15:00:00
  Investigation, Design And Construction Of Roads, Drains, Water Supply, Sewerage, Stp, Utility Ducts For Power & Ict, Reuse Waterline & Avenue Plantation Compatible With Trunk Infrastructure In Layouts For Land Pooling Schemes Pichukalapalem (Part) , Thulluru And Ananthavaram In Zone-4 Area In Amaravati Capital City, Andhra Pradesh On Epc Basis & Performance Based O &M Of The Infrastructure Created For A Period Of 7Years(Including Dlp Of 2Years). .
 
40 23-07-2018 15:00:00
  Provision Of Feeder Services Under West Cluster For Last Mile Connectivity With Procurement, Operation And Maintenance Of 16-22 Seater Low Floor Air Conditioner Electric(Battery Operated) Buses. .
 
<< Previous   Next >>

Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe

� 2000 Sugal Infotech LLP.