Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe
   

View Tenders
Daily 4,000 Tenders Uploaded


India Tenders - view all indian tender notifications, Indian government tenders news details, International Tenders inquiry, online tender Management System, online tenders and bidding, india Tender Online, tender Management System, Free Tenders from India, procurement notices, Tender procurement notices, Invitation of tender bids, top Indian tender portal, India Tenders Notification Services, Indian government tenders and Project Info, view all Latest Active Tenders.


S.No. Last Date of submission of tender
1 24-05-2018 17:00:00
  Rehabilitation And Upgradation To 2 Lane With Paved Shoulder From Existing Km 195.175 To Km. 220.00 (Design Chainage Km. 71.300 To Km. 95.947) Excluding Existing Chainage 199.800 To Km 201.900 (Design Chainage 76.400 To Km 78.400) On Dharasu To Yamun.
 
2 24-04-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 12 Village Pathare Kh. To Village Sonari In District Nashik.
 
3 26-04-2018
  Provision For Shifting Of Existing Different Sizes Of Distribution Pipeline From Gaurav J.C.B. Showroom To Young Men’S Christian Association, H.B. Road, Ranchi Due To Proposed Construction Of Kantatoli Flyover Under Juidco Ltd. Ranchi.
 
4 31-10-2018
  Consultancy Services For Authority’S Engineer For Supervision Of Construction Of Six/Eight Lane Vadodara Kim Expressway In The State Of Gujarat Under Nhdp Phase - Vi On Epc Mode - Package I From Km. 355.000 To Km. 378.740 (Padra To Vadodara Section), Package Ii From Km. 323.000 To Km. 355.000 (Sanpa To Padra Section), Package Iii From Km. 292.000 To Km. 323.000 (Manubar To Sanpa Section) Of Vadodara Mumbai Expressway.
 
5 12-06-2018
  Design, Manufacture, Supply, Testing, Commissioning And Training Of 378 Numbers Of Standard Gauge Metro Rail Cars
 
6 03-05-2018
  Planning To Construct Residential Houses Under The Scheme Of Pradhan Mantra Awas Yojna (Rural).
 
7 24-04-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 2 Village Khadki Amgaon To Village Pimpalgaon In District Wardha.
 
8 24-04-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 10, Village Fatiwabad To Village Surala In District Aurangabad.
 
9 20-05-2018 17:30:00
  Execution Of Narmada - Kshipra Multipurpose Project On Turnkey Basis For Lifting Of 15 Cumec Water For Irrigation In 30,000 Ha Up To 2.5 Ha. Chak And Including 5 Cumce Water For Industrial And Domestic Use As Per Detail Scope Of Work. .
 
10 22-05-2018 17:30:00
  Execution Of Narmada - Jhabua -Petalawad - Thandala - Sardarpur Micro Irrigation Scheme On Turnkey Basis For Lifting Of 18 Cumec Water For Irrigation In 52422 Ha Up To 2.5 Ha. Chak As Per Detail Scope Of Work. .
 
11 26-04-2018 17:30:00
  Construction Of Left Bank System Of Lower Orr Major Project To Deliver Water At Farmers Field Upto 1 Ha. From Fringe Of Lower Orr Reservoir With A Duty 0.33 Litres /Sec/Ha And Maintained Up To 30 Ha Chak And Discharge Of Minimum 10 Times The Duty At One Hectare By Pressurized Pipe Line/Canal System For Sprinkler Micro Irrigation In All Irrigable Area Estimated To Be Approximate 110400 Ha. Within Approximate Gross Command Area Of 154706 Ha. The Work Also Includes All Activities Starting From Survey, Investigation, Designing, Procurement, Construction, Laying, Installing, Energizing Etc. Of Pumping System, Rising And Gravity Mains, Main Line, Branch Lines, Distribution Network, Carrier Canal, Controlling And Regulation System Etc. For Supply Of Water For Irrigation Under Pressure With Scada And Automation. The Work Also Includes Management, Operation And Maintenance Of Complete Scheme For The Period Of Three Years. .
 
12 24-04-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 13 Village Sonari To Village Taranganpada In District Nashik.
 
13 09-05-2018 16:00:00
  Supply, Installation And Commissioning Of 190T Rear Dumpers Along With Consumable Spares And Consumables For 12 Mnths Of Warranty Period From The Date Of Commissioning Of The Equipment And Thereafter Spares And Consumables For A Period Of 84 Mnths .
 
14 10-05-2018 11:00:00
  Consultancy Services For Independent Engineer For Supervision Of Six Laning Of Nh-140 From Chittor (Design Km 0.000/Existing Km 158.000 Of Nh-4) To Mallavaram (Design Km 61.128/Existing Km 41.800 Of Nh-140) (Design Length = 61.128 Km) In The State Of Andhra Pradesh Under Bharatmala Pariyojna On Hybrid Annuity Mode
 
15 04-05-2018 17:30:00
  Lifting Of Water From Gandhisagar Reservoir Near Awra Village From Rl383m And Delivering At Farmers Field Up To One Ha Chak By Supply And Laying Of Rising Mains Construction Of Jack Well And Distribution Tanks Balancing Reservoir Laying Of Gravity Mains And Disnet System With A Duty Of 0 33 Lit Sec Ha Maintained Up To 30 Ha Chak And Discharge Of Minimum 10 Times The Duty At One Hectare And At Least 20 Meter Residual Head At Each Field For Micro Pressurised Irrigation Drip Sprinkler In The Culturable Command Area Of 80000 Hectare Out Of Gross Command Area 125000 Hectare The Entire Compact And Continuous Possible Arable Area Including 45 Mcm Water Supply To Gopalpura Tank Of Garoth Tehsil Work Includes All Activities Starting From Survey Investigation Designing Drawing Technical Sanction Procurement Construction Laying Installing Energizing Etc Of Pumping System Pump House Construction With Internal Electrification And Construction Of All Weather Approach Roads For Pump House Control Room Pipe Line And Disnet System Etc Along With Temporary And Permanent Land Acquisition If Required The Cost Of Permanent Land Acquisition Will Be Borne By The Department With Construction Of Structures For All Road/Nalla Railway Crossings Controlling And Regulation System With Scada And Automation The Work Also Includes Management Operation And Maintenance Mom Of Completed Scheme For Period Of Five Years.
 
16 04-05-2018 23:00:00
  Au-L2 Construction Of Two Laning Roads With Paved Shoulders In Nanded, Parbhani, And Hingoli Districts On Hybrid Annuity Mode .
 
17 24-04-2018 14:00:00
  Construction Of Access Controlled Nagpur Mumbai Super Communication Expressway Maharashtra Samruddhi Mahamarg In The State Of Maharashtra On Epc Mode For Package 1 Village Shivmadka To Village Khadki Amgaon In District Nagpur.
 
18 02-05-2018 17:00:00
  Manufacturing, Supply And Fitment Of High Security Registration Plates To All The Motor Vehicles, In Build, Own And Operate (Boo) Model In The State Of Maharashtra .
 
19 10-05-2018 14:00:00
  Supply of Cnc Multispindle Automatic Lathe 01 No .
 
20 26-04-2018 17:00:00
  Construction Of Missing Link With Viaduct From Km 0.000 To 13.300 And Up Gradation To 8 Lane From Km 32.800 To Km 38.700 On Epc Mode .
 
<< Previous   Next >>

Home | About Us Contact Us | Disclaimer  | FAQ's | Feed Back | Help | Logout | Advance Search | Subscribe

� 2000 Sugal Infotech LLP.